What a level survey is for

A level survey records the height of points across a site or floor relative to a datum. It answers practical questions quickly: will this drain fall to the outfall, is the screed within tolerance, where does the finished floor level need to be, and how much ground needs to move.

Typical uses

  • Drainage design. Existing levels and covers so engineers can design falls that work.
  • Slab and screed checks. Level grids that show whether a floor is flat and level enough for the finish going on it.
  • Floor and threshold levels. For extensions, flood risk assessments and planning drawings.
  • Site grading and earthworks. Existing levels to calculate cut and fill.

How we work

We survey with total stations, digital levels and GNSS, tied to Ordnance Survey datum or a site benchmark. Results come back as CAD and PDF drawings, with a level schedule if you need one. If you also need boundaries, buildings and features, a topographical survey captures levels and everything else in one visit.

Extract from a level survey drawing showing spot levels across a site

Level surveys and flood risk

If your planning authority has asked for levels for a flood risk assessment, see our level surveys for flood risk assessments. That survey concentrates on floor, threshold and ground levels to Ordnance Survey datum in the form your FRA consultant needs. A general level survey covers wider uses, such as drainage design, slab checks and earthworks, and can be tied to a site benchmark instead.

Datum and accuracy

Most level surveys are tied to Ordnance Survey datum (OSTN15), so the levels line up with flood data, sewer records and any later survey. For slab and screed checks inside a building, a local site benchmark is often more useful, because what matters is how flat and level the floor is rather than its height above sea level. We choose the method to suit the tolerance: digital levels for the tightest work on floors, total stations for detailed site levels, and GNSS RTK for open ground.

Slab and screed checks

Floor flatness is usually specified as a maximum deviation from a straight line or from the design level. We record levels on a regular grid across the floor and present them as a coloured level plan, so the high and low spots are obvious and remedial work can be targeted before finishes go down. For earthworks, the same grid gives existing levels for volume surveys and cut and fill.

How it works

  1. Scope and fixed quote

    We agree the areas, the datum and the outputs you need, such as plans, sections or a level schedule, then send a fixed price.

  2. Survey

    Our surveyors record levels with total stations, digital levels or GNSS, depending on the accuracy and the site.

  3. Drawings issued

    You receive clear CAD and PDF drawings, ready to use. Typical lead-in is 5 to 10 days.

Who we work with

  • Civil and drainage engineers

    Existing levels and cover levels to design falls, outfalls and attenuation.

  • Main contractors and flooring contractors

    Slab and screed level grids to check tolerances before finishes go down.

  • Architects and homeowners

    Floor, threshold and garden levels for extensions and planning drawings.

  • Groundworkers

    Existing levels for site grading, cut and fill and formation checks.

Recent projects

See all projects

Where we work

From our base in Leigh-on-Sea, Essex, we carry out level surveys across London, Essex, Kent, Hertfordshire and the rest of the UK. Local pages:

★★★★★

We recently approached THS Concepts to carry out a level survey of the screed to the ground floor of a large residential property we were Project Managing. The property was undergoing extensions and re-furbishment work. …

Minniedale Projects

★★★★★

We used THS Concepts for a topographical survey of a plot of land we're looking to develop with new houses. From the first contact they were easy to deal with and got the survey scheduled in quickly. …

Adam M

★★★★★

We booked a Topographical survey with THS. The response time was really quick and our job was booked in and carried out within a week. I received the results immediately. Really great service and competitive price wise compared to other quotes. …

Mark Maher

Level surveys: common questions

What is a level survey?

A level survey measures the height of points on the ground or a floor relative to a datum, usually Ordnance Survey datum or a site benchmark. It is used to design drainage, check that slabs and screeds are within tolerance, set floor levels and plan site grading.

What is the difference between a level survey and a topographical survey?

A level survey records heights only, usually at a grid or set points. A topographical survey records levels as well as every feature on the site, such as boundaries, buildings, trees and drainage. If you only need heights, a level survey is quicker and cheaper.

How much does a level survey cost?

It depends on the size of the area and the detail needed. We prefer to give a fixed price, though we can work to a day rate if that suits the job better.

How quickly can you return the levels?

Typical lead-in is 5 to 10 days, and level information can be issued as quickly as 24 hours after the survey.

Tell us about your site

Send a location, a rough brief and your deadline. We reply with a fixed quote within one working day.

Call 020 8935 5160Get a quote