Level surveys
Spot heights, floor levels and falls measured to OS datum or a site datum, for drainage design, slab and screed checks, flood risk assessments and site grading.
A level survey records the height of points across a site or floor relative to a datum. It answers practical questions quickly: will this drain fall to the outfall, is the screed within tolerance, where does the finished floor level need to be, and how much ground needs to move.
We survey with total stations, digital levels and GNSS, tied to Ordnance Survey datum or a site benchmark. Results come back as CAD and PDF drawings, with a level schedule if you need one. If you also need boundaries, buildings and features, a topographical survey captures levels and everything else in one visit.

If your planning authority has asked for levels for a flood risk assessment, see our level surveys for flood risk assessments. That survey concentrates on floor, threshold and ground levels to Ordnance Survey datum in the form your FRA consultant needs. A general level survey covers wider uses, such as drainage design, slab checks and earthworks, and can be tied to a site benchmark instead.
Most level surveys are tied to Ordnance Survey datum (OSTN15), so the levels line up with flood data, sewer records and any later survey. For slab and screed checks inside a building, a local site benchmark is often more useful, because what matters is how flat and level the floor is rather than its height above sea level. We choose the method to suit the tolerance: digital levels for the tightest work on floors, total stations for detailed site levels, and GNSS RTK for open ground.
Floor flatness is usually specified as a maximum deviation from a straight line or from the design level. We record levels on a regular grid across the floor and present them as a coloured level plan, so the high and low spots are obvious and remedial work can be targeted before finishes go down. For earthworks, the same grid gives existing levels for volume surveys and cut and fill.
We agree the areas, the datum and the outputs you need, such as plans, sections or a level schedule, then send a fixed price.
Our surveyors record levels with total stations, digital levels or GNSS, depending on the accuracy and the site.
You receive clear CAD and PDF drawings, ready to use. Typical lead-in is 5 to 10 days.
Existing levels and cover levels to design falls, outfalls and attenuation.
Slab and screed level grids to check tolerances before finishes go down.
Floor, threshold and garden levels for extensions and planning drawings.
Existing levels for site grading, cut and fill and formation checks.
Stratford, London
Floor levels recorded across hundreds of flats so a contractor could check them against the specified flatness standard.
Level surveys
From our base in Leigh-on-Sea, Essex, we carry out level surveys across London, Essex, Kent, Hertfordshire and the rest of the UK. Local pages:
★★★★★
We recently approached THS Concepts to carry out a level survey of the screed to the ground floor of a large residential property we were Project Managing. The property was undergoing extensions and re-furbishment work. …
★★★★★
We used THS Concepts for a topographical survey of a plot of land we're looking to develop with new houses. From the first contact they were easy to deal with and got the survey scheduled in quickly. …
★★★★★
We booked a Topographical survey with THS. The response time was really quick and our job was booked in and carried out within a week. I received the results immediately. Really great service and competitive price wise compared to other quotes. …
A level survey measures the height of points on the ground or a floor relative to a datum, usually Ordnance Survey datum or a site benchmark. It is used to design drainage, check that slabs and screeds are within tolerance, set floor levels and plan site grading.
A level survey records heights only, usually at a grid or set points. A topographical survey records levels as well as every feature on the site, such as boundaries, buildings, trees and drainage. If you only need heights, a level survey is quicker and cheaper.
It depends on the size of the area and the detail needed. We prefer to give a fixed price, though we can work to a day rate if that suits the job better.
Typical lead-in is 5 to 10 days, and level information can be issued as quickly as 24 hours after the survey.
Gridlines, foundations, piles and roads set out on site.
Floor plans, elevations and sections of existing buildings.
Send a location, a rough brief and your deadline. We reply with a fixed quote within one working day.