Pile positions set out to tolerance ahead of the rig, then surveyed as built with cut-off levels and offsets reported, so the engineer can sign off pile caps with confidence.
Misplaced piles mean redesigned caps, extra piles and delay. We set out vertical and raking pile positions and cut-off levels from your layout using robotic total stations and the site control, marking them in sequence ahead of the rig and re-marking any that the piling platform disturbs.

Once piles are installed, we survey their actual positions and cut-off levels and report the offsets against design. The engineer gets a clear schedule and drawing to check pile caps and ground beams before the substructure starts.
We also set out UXO probe positions ahead of piling on brownfield sites, and run vibration monitoring where piling is close to neighbouring buildings.
Piling moves quickly, and markers get lost as the rig tracks across the platform. We work to the piling sequence, marking positions a few piles ahead of the rig and re-marking any that are disturbed, so the rig never waits for a position. On large layouts we can mark offsets or reference lines so the piling crew can recover a position themselves.
The as-built schedule lists every pile with its design and as-built coordinates, the offset in each direction and the cut-off level. Piles outside tolerance are flagged so the structural engineer can check the effect on the pile caps and ground beams before the substructure starts. The same survey control is used for the rest of the building setting out, so the piles, caps and grid all agree.
Send the pile layout in DWG with coordinates or the site grid.
Positions are marked in sequence, and re-marked where the piling platform disturbs them.
Completed piles are surveyed for position and level, with offsets reported against design.
Piling setting out is usually booked by the day, often for several days in a row so the engineer keeps ahead of the rig. As-built pile surveys can be quoted with the setting out.
| Typical job | Guide price |
|---|---|
| Site engineer with equipment, per day | £600 |
| Defined packages | Fixed price on request |
Prices exclude VAT. Pegs, flags and profiles are included.
Positions marked when and where the rig needs them.
As-built offsets to check pile caps and ground beams.
Independent records of pile positions before the substructure.

London
Piling setting out, Volume surveys, Remote monitoring and alerts
From our base in Leigh-on-Sea, Essex, we carry out piling setting out across London, Essex, Kent, Hertfordshire and the rest of the UK.
★★★★★
We was looking for a local company to survey our setting out on our new build project and came across THS, We are VERY happy with the service they provided, Tom visited the site and was very helpful and professional. …
★★★★★
Excellent service, competitively priced and all completed as instructed. We now have a new allotment site in the London Borough of Redbridge with its plots professionally marked out. Thanks to Tom and the team.
★★★★★
THS Concepts provided Echo Construction Group with regular movement monitoring surveys which have been off great use during our basement excavation works and recommend them!
Pile positions are set out to well within the typical 75mm piling tolerance. The as-built survey reports the actual offset of every pile so the engineer can check it.
Yes. As-built positions and cut-off levels are surveyed and issued as a schedule and drawing, usually soon after each section of piling is complete.
Yes. Where piling is close to neighbours, we often run vibration monitoring on the same site.
The engineer's specification sets it. For most bearing piles the position tolerance is 75mm in plan, with tighter values for some contiguous or secant walls. We set out well within it and report the as-built offset of every pile.
Movement, crack, tilt and vibration monitoring with alerts.
Site levels, features and boundaries for planning and design.
Send a location, a rough brief and your deadline. We reply with a fixed quote within one working day.