Why party wall works are monitored

Basements, underpinning and demolition next to a shared wall all carry a risk of movement in the neighbouring building. Monitoring gives the building owner, the adjoining owner and their surveyors an independent record of what actually happened, so concerns are dealt with on facts rather than opinion.

Diagram of a party wall and shared foundation between two properties

What we monitor

  • Movement of the party wall and adjoining building, using total station targets read from a stable control network, typically to ±1mm.
  • Cracks in the adjoining property, using Demec studs and tell-tales. See crack monitoring.
  • Vibration at the boundary during piling or demolition. See vibration monitoring.

Who pays, and who receives the reports

Monitoring under a party wall award is normally paid for by the building owner carrying out the works, as a protection for the adjoining owner. The award usually names who receives each report, typically both party wall surveyors, the building owner’s engineer and the contractor. Reports go to everyone on that list within 24 hours of each visit, so nobody is relying on second-hand figures.

When it is written into the award

Surveyors usually include monitoring for basement excavations, underpinning, excavation close to the neighbouring foundations (see our party wall 3 m and 6 m checker) and demolition of attached buildings. The award sets the monitoring points, frequency and triggers, or refers to a monitoring specification prepared by the engineer. If you are an adjoining owner and want to understand what to expect, our guide My neighbour is building a basement explains the process.

Reports built for the award

Every report shows movement against the previous reading and against the original baseline, with tables and graphs clean enough to go straight into the party wall file. Most of our party wall monitoring is in London, and we cover every borough; see structural monitoring in London.

How it works

  1. Specification

    We work to the monitoring requirements in the award, or help the surveyors and engineer write them.

  2. Baseline

    Targets and studs are installed and two baseline surveys are taken before any works begin.

  3. Monitoring through the works

    Visits follow the works programme, weekly during excavation and underpinning, then less often.

  4. Close out

    A final report records the movement over the whole project for the surveyors' files.

What it costs

Party wall monitoring is a setup and two baseline surveys, then visits that follow the works programme. Vibration monitors, where the award requires them, are charged per monitor per week.

Read our guide to structural monitoring costs

Typical jobGuide price
Setup, including baseline readings£600 to £1,200
Each monitoring visit, including the report£200 to £400

Prices exclude VAT. Larger commercial and infrastructure schemes are quoted to the specification.

Who we work with

  • Party wall surveyors

    Defensible data to discharge your duties under the Party Wall etc. Act 1996.

  • Building owners

    Evidence that your works did not damage your neighbour's property.

  • Adjoining owners

    Independent records of how your building behaved while the works went on next door.

Where we work

From our base in Leigh-on-Sea, Essex, we carry out party wall monitoring across London, Essex, Kent, Hertfordshire and the rest of the UK. Local pages:

★★★★★

We have used THS Concepts for multiple surveys from topographic to drone photogrametry, they are professional and prompt and deliver exactly what is requested. Highly recommended.

David HopperMarmus

★★★★★

I contacted Tom to carry out a Topographic survey, and cannot recommend them enough. Nothing was to much, and I was kept up to date with everything as it happened! Great company to deal with and reasonably priced.

Billy BuckleyHomeowner

★★★★★

Superb service, quick turnaround and extremely helpful! I wouldn't hesitate to use THS Concepts again if I need to in the future!

Josh SaxbyHomeowner

Party wall monitoring: common questions

When does a party wall award require monitoring?

Usually for basements, underpinning, deep excavations within 3 or 6 metres of a neighbouring building (check yours with our 3 m and 6 m rule checker), and demolition. The surveyors and structural engineer decide what is needed, and it is written into the award.

When should monitoring start?

Before any works begin. A baseline taken after enabling works is not a true baseline. We take at least two pre-works surveys.

What triggers are typical?

Triggers should be set by the structural engineer. For London residential basements they are often around 5mm amber and 10mm red for total movement, with tighter values for sensitive or listed buildings.

What if a trigger is breached?

The named site contact is told the same day so works can be paused and reviewed. We do not wait for the next scheduled report.

Tell us about your site

Send a location, a rough brief and your deadline. We reply with a fixed quote within 24 hours.

Call 020 8935 5160Get a quote