Settlement monitoring by precise levelling
Vertical movement measured to ±0.5mm by precise levelling, from wall-mounted points read with digital levels and reported against baseline after every visit.
Measuring vertical movement precisely
Where settlement or subsidence is the main risk, precise levelling is the most accurate way to measure it. Our guide on how to monitor building settlement explains the method. We fix levelling points to the structure and read them with digital levels and invar staves from benchmarks set well outside the zone of influence, giving vertical movement to about ±0.5mm.

Where it is used
- Buildings and structures above or beside running tunnels
- Properties next to deep excavations and basements
- Ground affected by dewatering or piling
- Structures on soft or shrinkable ground
Settlement and subsidence monitoring for homes
For houses on shrinkable clay, near trees or showing signs of subsidence, levelling points read every month or two over a full year show whether the building is still moving and whether the movement follows the seasons. Insurers and engineers use that record to decide between monitoring, tree work and underpinning. Level monitoring is often combined with crack monitoring on the same visit.

Reporting
Every visit produces a report within 24 hours, with movement shown against the previous reading and the original baseline. If a trigger is breached, the named contacts are told the same day. Our guide on how to monitor building settlement explains the method in more detail.
How it works
Install
Levelling points are fixed to walls, columns or ground, with benchmarks set well outside the works.
Baseline
Two independent levelling runs establish the starting position.
Monitor and report
Points are re-levelled at the agreed frequency and movement reported within 24 hours.
What it costs
Settlement monitoring is a setup and baseline, then levelling visits at the agreed frequency, each with a report.
| Typical job | Guide price |
|---|---|
| Setup, including baseline readings | £600 to £1,200 |
| Each monitoring visit, including the report | £200 to £400 |
Prices exclude VAT. Larger commercial and infrastructure schemes are quoted to the specification.
Who we work with
Structural engineers
Precise vertical data where settlement is the main risk.
Contractors
Evidence through excavation, dewatering and piling.
Asset owners
Long-term settlement records over tunnels and on soft ground.
Where we work
From our base in Leigh-on-Sea, Essex, we carry out settlement monitoring across London, Essex, Kent, Hertfordshire and the rest of the UK. Local pages:
What clients say
Read all 90+ reviews on Google★★★★★
THS Concepts carried out movement monitoring for us during a large renovation in Leigh on Sea, needed as part of our party wall awards. Reliable readings throughout, kept us updated regularly and gave us real peace of mind during the works. Would recommend!
★★★★★
THS Concepts provided Echo Construction Group with regular movement monitoring surveys which have been off great use during our basement excavation works and recommend them!
★★★★★
Truly excellent Company and Staff. I tendered several Monitoring companies and THS Concepts communication via email was perfect. The Fees were reasonable and I was more than comfortable going ahead with them. …
Settlement monitoring: common questions
When is precise levelling better than total station monitoring?
When vertical movement is the main concern, for example over running tunnels, near large excavations or on soft ground. Levelling gives about ±0.5mm vertically, tighter than optical 3D monitoring.
How often are readings taken?
It follows the works, weekly during heavy operations and less often as risk reduces. We agree the schedule with the engineer.
Can it be combined with other methods?
Yes. Settlement monitoring is often run alongside 3D prism monitoring and crack monitoring on the same site.
Guides
Related services
- 3D laser scanning
Point clouds and BIM models of buildings, plant and structures.
- Setting out
Gridlines, foundations, piles and roads set out on site.
Tell us about your site
Send a location, a rough brief and your deadline. We reply with a fixed quote within one working day.