Getting the building in the right place

Setting out turns the drawings into marks on the ground. Get the grid or a footing wrong and every trade that follows builds on the mistake. Our engineers set out from your drawings with robotic total stations and check the results before work continues.

Setting out pegs and flags marking footings on a cleared site

From footings to frame

We set out structural gridlines with offset pegs, footings and ground beams, slab edges, walls and columns, holding-down bolts and finished floor levels. Pegs, flags and timber profiles are supplied free.

Checked and recorded

Before a pour or before steel arrives, we check what has been built against the design. If you need it, the checked positions are issued as an as-built drawing for your records. See as-built surveys for full laser scan verification.

How it works

  1. Drawings and quote

    Send the setting out drawings and what needs marking. We quote a fixed price or a day rate.

  2. Control and set out

    We establish control from the survey stations or site grid, then mark the agreed elements.

  3. Check and record

    Positions are checked before work continues, and an as-built record can be issued.

Who we work with

  • Main contractors

    Accurate grids and levels without a full-time site engineer.

  • Groundworkers

    Footings and slabs marked out ready to dig and pour.

  • Steel and frame contractors

    Bolt positions checked before the frame arrives.

★★★★★

We was looking for a local company to survey our setting out on our new build project and came across THS, We are VERY happy with the service they provided, Tom visited the site and was very helpful and professional. providing a detailed description and was very thorough. we will defiantly be using THS in the near future.

David EnglandGranite Design & Build

★★★★★

I was impressed by THS Concepts topographical survey services' professionalism and accuracy. They were efficient and reasonably priced. I highly recommend them.

Chris ConwayProject & Co Surveyors

★★★★★

We recently approached THS Concepts to carry out a level survey of the screed to the ground floor of a large residential property we were Project Managing. The property was undergoing extensions and refurbishment work. We had a tight timescale to receive the information, and THS Concepts delivered quickly and efficiently to meet our deadline. This is the second time we have used them and would highly recommend.

Paul BagnallEmperor Vision

Building setting out: common questions

What do you need from us?

The setting out drawings in DWG with the site grid or coordinates, and a clear list of what needs marking. Access to the site control or the topographical survey stations helps.

Do you check our own setting out?

Yes. Independent checks of gridlines, bolts and levels before a pour or before steel arrives are a common request.

How quickly can you attend?

Our standard lead time is 3 to 7 days, and we can often help with urgent requests.

Tell us about your site

Send a location, a rough brief and your deadline. We reply with a fixed quote within 24 hours.

Call 020 8935 5160Get a quote