Previous Monitoring Survey Projects

Across the UK and internationally, THS Concepts provides our monitoring survey service on a range of different projects from small basements to large multi storey new build projects. Read about some previous projects we have recently completed.

THS Concepts undertook a monitoring survey to check the deflection of iron piles supporting the longest pleasure pier in the world. The project was required for the commissioning of new, heavier electric trains to be run along the pier.

Client: Southend Council
Survey: 2 Days

Previous Monitoring Survey Projects​ At Southend Pier

As part of the ongoing maintenance of the stadium, THS Concepts checks a number of different monitoring positions in and around the stadium’s roof and the massive arch over the top of the stadium.

Client: Hollandia UK
Survey: 1 Day (Bi Annual Survey)

Monitoring survey at Wembley stadium in London

THS Concepts assisted the main contractor with their monitoring survey requirements on a 25 million pounds, residential refurbishment project. The project involved a 3-storey basement build with a cinema, parking area and swimming pool!

Client: Stoneforce
Survey: Weekly for 2 years.

Cleveland Row Monitoring Survey