Monitoring Survey Previous Project

Read about our monitoring survey in Cleveland Row, London

Article By: Tom Ayre

Client: Stoneforce LTD
Project Duration: October 2016 – March 2018
Location: St James’s, London
Surveyor: David Regan

Project Scope

Selwyn House is a large residential building next to St James’s Palace in London. The property was built in 1904 and backs on to the famous Green Park in London. As part of a multi-million-pound development, the property is undergoing major changes with the addition of a new floor and a multi-storey basement.

THS Concepts was appointed by Stoneforce Ltd to undertake weekly monitoring surveys of the property whilst the construction work was being undertaken. Due to the scale of the works the monitoring scope included other properties in the nearby area. Utilising a cherry picker we started by fixing our targets to the walls of the properties at various heights to give us the best possible understanding of the potential movement.

Following the initial set-up, our experienced surveyor David Regan returned to the project on a weekly basis to re-survey in the locations of these targets. The survey was undertaken using our Leica TS15 1-second instrument, renown for its high accuracy and reliability. The weekly survey and subsequent reports demonstrated the minor movements both vertically and horizontally that naturally occur with this level of construction work. The weekly movement reports and graphs clearly demonstrated the extent of the movement and how it is looking over time.

Selwyn House monitoring survey scaffolding

Interested in our Monitoring surveys?

Learn more
Previous Surveys

Monitoring Survey Results

The results of the survey were quite interesting to view. Over time a clear trend revealed itself in that the minor movements were contained to Selwyn House only. There was little to no effect on nearby buildings despite the extent of the works such as the basement being built. Another interesting trend that could be viewed as the extent of the movement during the “heavy” construction works. During the digging and extensive structural works, the points were subject to small movements however once this ended the point movement slowed down. This demonstrated nicely how the movement was as a result of the works.

Overall the project went well. If we were to undertake it again we would try to place the targets on the buildings in slightly better positions that would allow us to set up our survey equipment in fewer locations. That would speed up the time on site, allow us to get back to the office quicker and issue the report for that day faster.

Selwyn House monitoring survey total station
Selwyn House monitoring survey in progress

Recent Posts

Get More Great Articles

Useful Guides, Tips & Tricks, Get Better At CAD With Our Pointers

Blog Catergories

Related Articles

By |2018-07-06T13:47:16+00:00March 21st, 2018|Monitoring Surveys|0 Comments

Leave A Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.