Leica TS02 Tutorial | Powering Up Your Instrument to the Main Menu

Leica TS02 Tutorial | Powering Up Your Instrument to the Main Menu

  • Following the setup of the tripod, screw your total station onto the tripod legs. Then switch it on using the red power button on its side
  • Before using the computer levelling programme on your TS02, get the tripod and instrument approximately level using the bubble on top. This will save time in future, as adjustment will be necessary if the legs and instrument are far off being level
  • Once your Leica TS02 is on it will go past the Leica Geosystems splash page. It will then proceed to the ‘Level and Plummet’ page at which it will require further adjustment to ensure it is level. Please note we’re assuming that you know how to level your Leica using the screws on the tribrach!
  • Once you have has adequately levelled the instrument, proceed to the next screen by pressing F4 which is the button below the word ‘Cont’ on the monitor

 

Powering up Leica TS02

Recent Posts

By | 2017-11-13T12:28:02+00:00 July 20th, 2015|Leica TS02 Tutorial, Surveying Info & Tutorials|0 Comments

About the Author:

Leave A Comment